The next report, I want to introduce KER to you. This report is provided another view of point with KSR. it look like below picture.
This report is I create for a LED FAB.
2014年1月3日 星期五
2013年12月25日 星期三
The Most Important Report In MFG -- KSR
KSR is Key Stage Report, It shows the whole production line status in one report. It's a very useful tool when you want to know the line situation deeply.
KSR是重要站點報告,他可以展現整個產獻的狀況.這個報表在深入了解線上狀況時事一個很有用的工具.
KSR is a throughout views, and it record WIP/HWIP (Hold WIP,)/ Wait Time/ Stage Target/Move information by technology.
KSR looks like this format (It's Create by me for a LED FAB, it create by Excle VBA)
KSR是一個縱觀的報表,他紀錄了各產品別的在製品,暫置的在製品,等候時間,站點目標,產出資訊.
KSR報表的格式如同附圖一樣(這是我用Excel VBA所製作的一家LED公司所使用的KSR)
KSR是重要站點報告,他可以展現整個產獻的狀況.這個報表在深入了解線上狀況時事一個很有用的工具.
KSR is a throughout views, and it record WIP/HWIP (Hold WIP,)/ Wait Time/ Stage Target/Move information by technology.
KSR looks like this format (It's Create by me for a LED FAB, it create by Excle VBA)
KSR是一個縱觀的報表,他紀錄了各產品別的在製品,暫置的在製品,等候時間,站點目標,產出資訊.
KSR報表的格式如同附圖一樣(這是我用Excel VBA所製作的一家LED公司所使用的KSR)
2013年12月21日 星期六
Common Used Report in Manufacturing--MFG indices Daily Summary Report
FAB plan /operation Report and System as the picture shows in below.
工廠內的計畫/運作報表及系統如同下圖所示:
All the Manufacturing Plan are comes form MPS ( Master Production Schedule) and FAB cycle time plan, and MPC (Manufacturing PC) will generate a FAB daily operation plan daily.
所有的製造計畫都來自於主排程以及工廠內的生產週期計畫,製造部的PC將會把主排程的目標拆解成每天的執行計畫.
工廠內的計畫/運作報表及系統如同下圖所示:
All the Manufacturing Plan are comes form MPS ( Master Production Schedule) and FAB cycle time plan, and MPC (Manufacturing PC) will generate a FAB daily operation plan daily.
所有的製造計畫都來自於主排程以及工廠內的生產週期計畫,製造部的PC將會把主排程的目標拆解成每天的執行計畫.